Saturday, November 8, 2014

Production Logbook

9/11/14-Orientation for the Mobile
-Sir Oro told us what we are going to do that quarter which is the mobile
9/15/14-Intramurals
9/16/14-Intramurals
9/18/14-Intramurals
9/22/14-Design for the Mobile
-The three of us started to create a design for the mobile which turned to be like this
9/23/14-Constraints & Considerations for the Mobile
-While the other two (JT and Daniel) continued to improvise the design, I started to create the constraints and considerations for the mobile.
9/25/14-Measurements...
-On this day, we started to begin with the real deal, we started on measuring the wood parts with the help of our design
9/29/14-Cutting the Wood
9/30/14-Hanged Items...
-On this day, we started to divide the wood parts to cubes for our hanged items
10/2/14-Waley si Sir Oro
10/6/14-Waley si Sir Oro, too
10/7/14-Hanged Items... Part 2:)
-Today, Daniel started to apply our theme for the mobile on the cubed wooden parts...
10/9/14-Hanged Items...Part 3:)
-On that day, the two started to carve out the drawings on our wood cubes...
10/13/14-Waley si Sir Oro
10/14/14-Waley si Sir Oro
10/16/14-Hanged Items...Part 4:)
-On that day, the two continued on carving, while I started to cut the other pieces of wood for the horizontal beams of our mobile...
10/20/14-Hanged Items...Part 5:)
-On that day, the two continued on carving while I'm working for the documentations
10/21/14-Paint the Wooden Beams
-We started to paint for the wooden beams, starting with a wrong technique for drying it took us long and required us to continue the next day
10/23/14-Paint the Wooden Beams part 2
10/27/14-Put the Hanging Items to the Wooden Items
10/28/14-Polishing for the Mobile
10/30/14-Finished Project xD